The order of works

In the book: “A printable A4 planner and a first-winter watch list.”

Checked October 2026

Printable for book owners: Order of works planner (A4 PDF). Book owners: unlock with the code printed in your book.

In short

  • Stop the water, let it dry, repair it, then make it comfortable. The kitchen comes last.
  • If scaffolding goes up, do everything at height at once.
  • Get a winter in before the big decisions, but deal with safety and leaks straight away.

The sequence

  1. Safety now: gas, electrics, alarms, active leaks.
  2. Water in: roof, chimneys, gutters.
  3. Water away: drains, gullies, ground levels.
  4. Fabric: lime pointing, stone, timber, windows.
  5. Services: wiring, plumbing, heating. Asbestos survey first.
  6. Warmer without harm.
  7. Finishes.

One room, start to finish

A front room in one of the author’s own restoration projects.

  1. A front room piled high with bin bags, boxes and furniture, a curtain hanging loose over the window.
    Before: the front room as found, still full of the previous contents. Photo: Rory J Dench, Natural Stone Craft.
  2. The same front room emptied, with carpets lifted, wallpaper half stripped and a stepladder in the middle of the floor.
    Strip-out: the same room with the carpets up and the paper coming off, so you can see what you’re dealing with before anything gets fixed. Photo: Rory J Dench, Natural Stone Craft.
  3. The same room finished: an exposed stone wall, stone flooring, a terracotta rug, a red sofa and armchair and bright curtains at the window and glazed door.
    After: the same room finished, with the stone wall left exposed and stone flooring. Photo: Rory J Dench, Natural Stone Craft.

Along the way

A room with stripped stone walls and a row of steel props holding up a new steel beam across the ceiling.
Temporary props under a new steel beam where a wall was opened up. Structural work like this comes early, needs an engineer and, in Scotland, a building warrant. Photo: Rory J Dench, Natural Stone Craft.
A new dormer with pale timber cladding and a dark grey window, behind scaffolding, with green protective membrane over the roof edge.
A new timber-clad dormer going in under scaffold, with the roof covered in a temporary protective membrane. Photo: Rory J Dench, Natural Stone Craft.

The first winter teaches you

  • where water really gets in;
  • which damp patches dry out once the causes are fixed;
  • where the cold spots and draughts are.

The PDF has the planner and a watch list to fill in. Tenements: agree stages 1 to 3 with neighbours first (see tenements).