In short
- Stop the water, let it dry, repair it, then make it comfortable. The kitchen comes last.
- If scaffolding goes up, do everything at height at once.
- Get a winter in before the big decisions, but deal with safety and leaks straight away.
The sequence
- Safety now: gas, electrics, alarms, active leaks.
- Water in: roof, chimneys, gutters.
- Water away: drains, gullies, ground levels.
- Fabric: lime pointing, stone, timber, windows.
- Services: wiring, plumbing, heating. Asbestos survey first.
- Warmer without harm.
- Finishes.
One room, start to finish
A front room in one of the author’s own restoration projects.

Before: the front room as found, still full of the previous contents. Photo: Rory J Dench, Natural Stone Craft. 
Strip-out: the same room with the carpets up and the paper coming off, so you can see what you’re dealing with before anything gets fixed. Photo: Rory J Dench, Natural Stone Craft. 
After: the same room finished, with the stone wall left exposed and stone flooring. Photo: Rory J Dench, Natural Stone Craft.
Along the way


The first winter teaches you
- where water really gets in;
- which damp patches dry out once the causes are fixed;
- where the cold spots and draughts are.
The PDF has the planner and a watch list to fill in. Tenements: agree stages 1 to 3 with neighbours first (see tenements).