Printable for book owners: Crack monitoring sheet (A4 PDF). Book owners: unlock with the code printed in your book.
In short
- Mortar should be softer than the stone or brick: lime is meant to be the weak link.
- Hard cement pointing traps water, so the stone wears away instead of the joint.
- Width matters, but so does whether a crack is still moving.
Reading a crack
The lights are the book’s: ● GREEN normal, or a good sign; ▲ AMBER find out more before you commit; ■ RED stop and get a specialist to look before you go further. The colour is a starting point, not a verdict.
| Crack width (BRE Digest 251) | Light | What it usually means |
|---|---|---|
| Up to about 1 mm | ● GREEN | Usually cosmetic. |
| About 1 to 5 mm | ▲ AMBER | May need repair; photograph it and watch it. |
| Over about 5 mm, tapering, stepped or growing | ■ RED | Possible structural movement: a structural engineer. |
Photograph every crack with a ruler and the date, and again in six months from the same spot.
Finding a lime mason
- Ask to see lime work done three to five years ago or more.
- Ask: “How will you rake out the joints, and will you use a grinder near the stone?” The right answer: by hand, and no.
- Look for lime training (Scottish Lime Centre Trust, the Engine Shed) and trade membership, but ask about lime.
Cleaning stone
Abrasive and chemical cleaning can do permanent harm to sandstone, and often needs consent. Ask the council first. Often the right answer is not to clean at all. (The interest disclosure in the footer applies here.)
Decayed sandstone, and the repair


Coming soon: a colour photo guide to cement damage.
Official and useful links
- Historic England: repointing brick and stone walls
- Engine Shed: how to repoint rubble masonry
- Engine Shed: how to repoint ashlar masonry
- Historic Environment Scotland: find skilled tradespeople
- Scottish Lime Centre Trust
- Stone Federation Great Britain
- CARE: Conservation Accreditation Register for Engineers (Institution of Civil Engineers)